Got tired of waiting to see some concrete get poured so we whined pretty hard and got the septic system stuff all figured out tout suite. Got the entire order for the all the septic gear (minus a bunch of fittings and pipe we actually needed :/ ) but we pervailed. Got the tanks dropped in and the field dug out in one day. Got the field levelled and half installed in another. Should be looking pretty good in another. Definitely some good production days.

No comments:
Post a Comment