Lots of time spent compacting the excavation in preparation for foundation footings. Dad the sniper has become educated in the ways of total station and we signed in all the house coordinates. After that, load in them 2x8s and bang on! Laser level all the top of the footing boards in to get it sorted. After that, a local rebar sales and installation company came and installed all the steel.
No comments:
Post a Comment